National Repository of Grey Literature 20 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Influence of the type of window elements to the cost price of construction
Chmelařová, Kateřina ; Tuscher, Martin (referee) ; Krejza, Zdeněk (advisor)
This thesis explains the influence of the type of window glass openings on the cost price of the building. Price depends on choosing the type of windows in a combination of different materials. The theoretical part describes the type of window apertures, their characteristics and advantages and disadvantages. The result of the study is to determine the percentage of volume, price of shares selected variants of window apertures on the cost price of the object.
Planning of Resources for Construction Project
Šebelová, Zuzana ; Frýbort, Tomáš (referee) ; Nováková, Jana (advisor)
The main aim of this bachelor thesis is to describe basic principles of the construction project resource planning. The theoretical part explains the basic concepts of project management, further describes principles of cost, source and time planning. The important part is the practical part, which deals with the application of the clarified procedures and methods to a specific construction project.
Planning of Resources for Construction Project
Dočkal, Jan ; Rumlová, Marcela (referee) ; Nováková, Jana (advisor)
The main aim of bachelor thesis is introduce problems of project management focused on resource planning of a construction project to readers. Thesis explains particular principles and procedures which are connected with human resource planning and necessary cost for realization of project without problems. The important part is to illustrate these methods in practise followed by specific project.
Apartment house Novosedly
Kalousová, Kamila ; Pilný, Ondřej (referee) ; Sedláková, Markéta (advisor)
The proposed building is thus a apartment building with garages, which will be located in the village of Novosedly, in South Moravia, on two plots no. 5420/83 and 5420/84. The terrain on which the object is in a slight slope. The building of the block of flats is made of brick blocks, for the above-ground part and in the underground part it is lined with lost formwork. The roof structure of the building is arched from wooden beams.
Poděbradská Commercial and Administrative Center - construction technology project
Kmeť, Peter ; Boháček, Adam (referee) ; Biely, Boris (advisor)
This diploma thesis focuses on construction technology preparation of shopping center in Prague 9, Vysočany. The aim of this work was to choose an appropriate construction process. The thesis contains general information about construction with construction technology project, its financial and time consuming, facilities for construction and traffic situation in the surroundings of the construction, design of main machinery and mechanisms, technological regulation with control and test plan. The diploma thesis is focused on piles realization.
Construction Order Management in the Construction Company
Vavřinka, Pavel ; Ptáček, Petr (referee) ; Nováková, Jana (advisor)
The aim of diploma thesis is to describe and analyze organization of construction contract at the specific construction company. Introduction contains summary of theoretical knowledge, followed by construction order preparation on general level. The practical part contains application on specific construction contract.
Evaluation of the construction and technical condition of the existing building
Janáč, Martin ; Láník, Jaromír (referee) ; Schmid, Pavel (advisor)
The theoretical part of my bachelor's thesis deals with the history, development and testing of masonry, especially aerated concrete and cinder block masonry, of which a large part of the evaluated building is constructed. In the practical part, the thesis focuses on the actual assessment of the existing condition of the building, especially by means of visual defectoscopy, the design of measures and the suitability of its possible future use.
The new building hall of production
Vyskočil, Stanislav ; Sedlák, Radek (referee) ; Beneš, Petr (advisor)
Master´s thesis deals with the project documentation of the design of the new building hall of production. This hall is situated in Slapy at Tábor. Design and appendix´s were made by the present valid laws, goverment´s restrictions and standards. This object is placed in ground plot number 104/12, the land cadastre of Slapy at Tábor. The building object is designated for factory and storage area. Next to the building plot carry underground services. In the building object is factory hall and cloakroom for 2-4 employes. Director´s flat is in first floor. Building has two floors and floor plan 12,5 x 30,5 m on final grade. The carrying systém is from hollow building brick. The building has gable roof. Specialization is processed on „heating the building“ witch forms separate annex of Master´s thesis.
Planning of Resources for Construction Project
Vavřinka, Pavel ; Ježková, Petra (referee) ; Nováková, Jana (advisor)
The aim of bachelor thesis is to describe basic principles, methods and procedures of resource planning. Theoretical part explains individual principles of financial planning and human resources planning which as-sure smooth project process. Practical part contains application of these procedures on the specific building object.
Family house with solicitor's office
Vyskočil, Jakub ; Hamrl, Luděk (referee) ; Sukopová, Dáša (advisor)
Bachelor´s thesis deals with the project documentation of the design of the new Family house with solicitor's office. This house is situated in ezimovo Ústí. Design and appendix´s were made by the present valid laws, goverment´s restrictions and standards. This object is placed in ground plot number 133/19, the land cadastre of Sezimovo Ústí. The building object is designated for family houses area. Next to the building plot carry underground services. In the building object is owner occupancy and solicitor's office for 2-4 employes. Owner´s flat is in first and second floor. Building has three floors and floor plan 16,16 x 11,66 m on final grade. The carrying systém is from hollow building brick. The building has gable roof.

National Repository of Grey Literature : 20 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.